Projects

Gas Turbine Insulation Model MHI 701 D (Mitsubishi) Unit G11 Kazeroon Combined Cycle Power Plant (2018)

Gas Turbine Insulation Model MHI 701 D (Mitsubishi) Unit G11 Kazeroon Combined Cycle Power Plant (2018)

Insulation Unit 4 (V94.2) Parand Combined Cycle Power Plant (2018)

Insulation Unit 4 Sanandaj Combined Cycle Power Plant (2018)

Insulation Unit 4 Sanandaj Combined Cycle Power Plant  (2018)

EPC Replacing the Air Filtration System to the Compressor Unit of Shahid Salimi Neka Power Plant (2014)

EPC Replacing the Air Filtration System to the Compressor Unit of Shahid Salimi Neka Power Plant (2014)

Repairs, adjustment and testing of three lines of pressure reduction of the main gas station of Rudshvar Power Plant (2013)

Repairs, adjustment and testing of three lines of pressure reduction of the main gas station of Rudshvar Power Plant (2013)

Supply of Unit 5 (V94.2) Insulation of Parand Power Plant (2011)

Supply of Unit 5 (V94.2) Insulation of Parand Power Plant (2011)

Advisor for switching the air filtration system to the two-gas compressor unit of Shahid Salimi, Neka Power Plant (2011)

Advisor for switching the air filtration system to the two-gas compressor unit of Shahid Salimi, Neka Power Plant (2011)

Supply of Turbine Compressor Filters V94.3 (2010)

Supply of Turbine Compressor Filters V94.3 (2010)

Regeneration of turbine filtration system of Ray power plant (2010)

Regeneration of turbine filtration system of Ray power plant (2010)

Insulation project of Hormozgan steam turbine (2010)

Insulation project of Hormozgan steam turbine (2010)

Isolation project of Hormozgan steam turbine (2010)

Providing 2,000 square meters of advanced scaffolding for the Siemens power plant project (2010)

Providing 2,000 square meters of advanced scaffolding for the Siemens power plant project (2010)

Overhaul of Rudshour thermal power plant (2010)

Overhaul of Rudshour thermal power plant (2010)

Insulation project of 4 gas turbine units of Bandar Imam Petrochemical Complex (2009-10)

Insulation project of 4 gas turbine units of Bandar Imam Petrochemical Complex (2009-10)

Isolation project of 4 gas turbine units of Bandar Imam Petrochemical Complex (2009-10)

Supply of spare parts for Rudshour thermal power plant (2009-10)

Supply of spare parts for Rudshour thermal power plant (2009-10)

Noise Enclosure repair of a Rudshur power plant (2009)

Noise Enclosure repair of a Rudshur power plant (2009)

Supply and installation of insulation of 3 turbine units V94.3 of Rudshvar Power Plant (2007)

Supply and installation of isolation of 3 turbine units V94.3 of Rudshvar Power Plant (2007)  

Repairs and overhauls of the gas pressure relief station of Rudshur thermal power plant in cooperation with Furintini Italy

Repairs and overhauls of the gas pressure relief station of Rudshur thermal power plant in cooperation with Furintini Italy